Thorson RestorationPlymouth, MA Leave a number
The work

What we open when plaster sags on Hedge

Residential remodelers: dry-out, rebuild, finish. Eric still writes the first moisture note himself.

Open-wall dry-out

Stained plaster comes off. Air movers stay. We do not hang new board while the joist still reads wet.

Structural rebuild

Studs, joists, and the hang that stays plumb. Plymouth houses that took water get wood, not a coat.

Finish after dry-out

Trim and plaster once Hedge Road signs the bay. The room is for living, not for a same-day close.

Kitchen and bath remodel

Wet rooms we rebuild after the leak, not a catalog kitchen dropped on a damp subfloor.

Air movers drying a Plymouth living room after water Kitchen remodel with new studs and drywall in progress
Order of work

Sound the bay, dry the wood, hang the rooms

Three ticks. Skip one and the brown ring returns with the next storm.

01Finished Plymouth room after rebuild

Sound

Eric walks the ceiling, knocks the joists, and marks what is still soft. The sit starts on Hedge Road, not on a clipboard in a van.

02Dry-out equipment in an opened room

Dry

The bay stays open. Air runs until the numbers settle. We write those numbers before anyone talks color.

03New drywall hanging after dry-out

Hang

New board, trim, and a room you can live in. Finish is last because wet wood does not keep a Plymouth winter.

Leave the number. Eric rings Hedge Road back.

Pick the sit on the stud rail. The shop calls from 12 Hedge Rd.

Hang a ticket