Thorson RestorationPlymouth, MA Leave a number
Opened wet wall with exposed studs in a Plymouth house
Restoration · Plymouth

Leave the wet bay open until Hedge Road says dry

THORSON RESTORATION & CONSTRUCTION LLC opens stained walls, dries the wood, then rebuilds the rooms from 12 Hedge Rd — Eric still walks the joists himself.

Before we pull plaster

What Plymouth rooms ask before we pull a ceiling

No. A same-day close is paint over wet wood. We leave the bay open until moisture numbers settle, then hang new board from Hedge Road.

A ring on the ceiling is a map, not a finish. We sound the joists, dry the bay, and only then talk trim. Paint is last on purpose.

Eric still takes the first sit. Six people work from 12 Hedge Rd. You get a person, not a tablet in a franchise van.

The shop

Eric still sounds every joist on the walk

From 12 Hedge Rd, Eric P Thorson walks the wet room before anyone hangs board. Thirty-five years of Plymouth remodel work, six people, one shop — not a call center.

35Years on Plymouth jobs
6People at the shop
12Hedge Rd, Plymouth
MAResidential remodelers
The work

Structure first, then the Plymouth finish

Water, rebuild, and the rooms that have to live through the next storm — not a paint-and-run.

Open-wall dry-out

We peel stained board, run air, and write moisture numbers before anyone talks about color.

Structural rebuild

Studs, joists, and the hang that stays plumb after the wood has actually dried.

Finish after dry-out

Trim, plaster, and rooms you can live in — only after Hedge Road signs the bay dry.

How we work

Paint never hides a bay that still reads wet

A ledger, not a slogan. We write the sit, dry the wood, then hang the rooms. Skip a line and the brown ring comes back.

  • Sound
    Walk the joists

    Eric knocks the bay and marks what is still soft before a dumpster shows up.

  • Dry
    Leave it open

    Air movers stay until the numbers settle. We do not close a wet cavity for a faster invoice.

  • Hang
    Then the rooms

    New board, trim, and a Plymouth finish only after the wood is actually dry.

After the bay is dry

Plymouth rooms after the bay is dry

Finished plaster, a street face, and the van back on Hedge — not a same-day close.

Finished restored living room in Plymouth Plymouth colonial house with a work van at the curb
Eric sounding joists in an opened Plymouth ceiling
The crew

Six people, one shop on Hedge

THORSON RESTORATION & CONSTRUCTION LLC is Eric P Thorson and five others who still bag wet board. No franchise tablet. The van comes back to 12 Hedge Rd when the sit is done.

Meet the shop

From nearby streets

Notes left after the van left Hedge

Neighbor off Manomet Ave

The ceiling stayed open until the wood dried. No brown ring came back with the next rain.

A kitchen on the Plymouth side

Cabinets off, numbers written, then the hang. Finish waited. That is the whole sit.

What we will not do

We do not bury wet wood under a coat

Numbers before paint

Moisture gets written down. A pretty close is not a dry bay.

A person on the sit

Eric or someone from the six. No script from a call center.

Hedge Road, not a route map

The shop is a street in Plymouth. The van parks there after the work.

Leave the number. Eric rings Hedge Road back.

Type a phone. The stud rail thanks you on this site — then the shop calls from Plymouth.

Hang a ticket